Electrosonic O&M Manual Science of Survival CJ20628
Operation
Power Up Procedures
It is good practise before starting up the AV system to ensure that all of the racks
have power connected, this is shown by the neon above the supply connector being
on and the neon next to the “circuit 1” control breaker. If the power is on then the
racks will come on and off at the programmed time. Refer to Maintenance Section
about changing these.
Should the system need to be turned on and off out of these hours, it can be done in
one of two ways.
Rack by Rack
Each rack has its own power on and off button in the top panel next to the network
switch window.
Global power control
In Rack 18, there is a “Global Power” pair of buttons that can switch the system on
and off.
Note it is important that the Conclusion racks are powered up a few minutes before
the other equipment as the RFID server needs to be connected before any of the
exhibit PC’s.